Ng Teng Fong General Hospital — Pipe & Scupper Drain Welding Works

Project Overview

This project was conducted at the JHC Garden, Ng Teng Fong General Hospital, and was formally completed on 19th August 2023. The scope of work included the installation of pipes on the façade and the careful installation of scupper drains on the floor, designed to ensure the efficient drainage of rainwater from the pipes to the drain during rainfall. Our company specializes in comprehensive piping services and scupper drain work, ensuring efficient water management and drainage solutions tailored to our clients’ needs, which are essential for preventing water accumulation and ensuring proper runoff of rainwater from the roof in both residential and commercial properties.

en_USEnglish